Case Study:
Prairie Mountain Screening
PROBLEM: High energy bills.
SOLUTION: Multi phase roof mounted solar project that will offset as much as 50% of this high volume silk screening factory’s electric bill.
Quick Facts
PROJECT SCOPE: Phase 1 : Install a 63 kW of solar and make upgrades to the electrical system to be able to manage another 75 kW.
ECONOMICS
INCENTIVES: $112,971
Total Lifetime Savings: over $400,000 (based on a 5% annual utility rate increase)
Return on Investment: 16.5%
